West Boylston Water District RatesEffective April 1, 2007
Please note that the Water District is in the midst of a 3-phase change of the rate system. Phase 1 was effective April 1, 2005; Phase 2 was effective April 1, 2006; Phase 3 will go into effect on April 1, 2007. For each phase, the amount of gallons in each block will decrease. Previous West Boylston Water District RatesEffective April 1, 2006
Effective April 1, 2005
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1" | 2" | 4" | 6" | 8" | 10" | 12" |
| $3,450 | $5,175 | $8,050 | $12,075 | $14,950 | $17,825 | $21,850 |
Effective April 1,2007
Installation Fees are Optional. They are charged for the Water District to install a 1" service from the street to the property line only. THESE FEES MUST BE PAID BEFORE THE WORK IS SCHEDULED.
| Property on same side as water main to property line | $1,150.00 minimum |
| Property on opposite side of water main to property line | $1,725.00 minimum |
Effective April 1, 2007
| Customer Class | Charge |
| Residential | $1,725.00 per meter |
| Apartment (with 1 meter) | $1,150.00 per unit |
| Restaurant | $143.75 per seat |
| Office | $287.50/1,000 square feet |
| Retail | $172.50/1,000 square feet |
| Industrial | $34.50/1,000 square feet |
| Sprinkler* | $80.50/1,000 square feet |
*Sprinkler lines and water service lines are considered as two separate connections.
Effective April 1, 2007
| Turn on or off at curb | $57.50 |
| Cross Connection Survey | $57.50 per hour with a 1 hour minimum |
| Testing Backflow Preventer | $57.50 per test, per device |
| Hydrant Flow Test | $230.00 per test |
| Metered Hydrants | $57.50 per day plus water usage at current rate |
| Meter Test 5/8" | $40.25 (no charge if the meter is over-registering) |
| Special Meter Reading (for final bill) | $28.75 |
| Meter Valve Replacement 5/8" | $86.25 |
| Construction Meter 5/8" | $287.50, prepaid plus usage |
| Construction Meter 2 1/2" | $575.00, prepaid plus usage |
| Residential Meter 5/8" Radio Read | $345.00 installed with 3/4" valve |
| Regular hours rate | $57.50 per hour |
| After Hours Overtime Rate | $86.25 per hour, with 2 hour minimum |
Effective April 1, 2005
Sprinkler fees are calculated based on the area of the building as determined by the records of the West Boylston Board of Assessors.
| Building Area in square feet | Annual Charge |
| Up to 9,999 | $200.00 |
| 10,000 - 19,999 | $300.00 |
| 20,000 - 29,999 | $400.00 |
| 30,000 - 39,999 | $500.00 |
| 40,000 - 49,999 | $600.00 |
| 50,000 - 59,999 | $700.00 |
| 60,000 - 69,999 | $800.00 |
| 70,000 - 79,999 | $900.00 |
| 80,000 - 89,999 | $1,000.00 |
| 90,000 - 99,999 | $1,100.00 |
| 100,000 - 149,999 | $1,600.00 |
| 150,000 - 199,999 | $2,050.00 |
| 200,000 and over | $2,400.00 |
|
|
Fee Definitions |
|
|---|---|---|
|
Connection Fees are charged for the privilege to connect to or alter the water system. They are for new services only and must be paid before work is started. User Fees are in addition to connection fees. It is charged for the privilege to use water. It must be paid before the water service is activated. Water Usage Fees are quarterly bills based on the amount of water used. Installation Fees are optional and must be paid before the work is scheduled.
|
||
|
|
Sewer Bills? |
|
|
Have a question on your Sewer Bill? Though your Sewer Bill is based on the amount of water you use, Sewer Bills are generated by the Town of West Boylston's Sewer Division and are not associated with the Water District. You can reach the Sewer Division at 508-835-6133.
|
||